# Arizona conditional and unconditional lien waiver form

> Start with a 30-day trial, then Starter at $99 a month (up to 3 active jobs) or Pro at $249 a month (unlimited jobs). Your subs and owners don't need a paid seat.

Build it in minutes. Create an account to download. All four Arizona statutory forms from ARS 33-1008(D), in the words the statute prescribes. A waiver that does not follow them substantially is unenforceable, so this prints the statute’s text and you fill in the blanks.

## Conditional or unconditional?

A conditional waiver releases nothing until the check it names has been endorsed and paid by the bank. An unconditional waiver is enforceable against you once you sign it, even if you were not paid, which is what its notice says. Send the conditional form to get paid. Sign the unconditional form only after the money is in your account.

## Progress or final?

A progress waiver covers your work through a date and does not cover retention, pending changes or anything furnished after that date. A final waiver covers the whole job, except any disputed amount you write in.

## Does an Arizona lien waiver have to be notarized?

ARS 33-1008 does not require it. The waiver has to follow substantially the statutory form and be signed by you or your authorized agent, and a conditional waiver needs evidence of payment, such as your endorsement on the paid check.

## Can I change the wording?

33-1008(D) makes a waiver unenforceable unless it follows substantially the form for its situation. This page prints the statute’s wording; you fill in the blanks.

## The guide behind it

[The Arizona Preliminary 20-Day Notice: Who, When, and the Fourth Party](https://buildcontrol.group/learn/arizona-preliminary-20-day-notice). What ARS 33-992.01 requires before an Arizona mechanics lien is possible, the four people who must be served, the twenty days, the two ten-day duties the notice puts on the owner, and the thirty percent rule that quietly voids a notice nobody thought about again.

## How to download

Fill in the form on the page and watch the preview. To get the PDF, create an account; the document is saved to a job in your account, named after the project.

General information, not legal advice. BuildControl is not a law firm. Confirm anything here against the Arizona Revised Statutes or an Arizona construction attorney before you rely on it.

Source: https://buildcontrol.group/tools/arizona-lien-waiver
