What an ICRA is

An infection control risk assessment (ICRA) is how a hospital decides what dust and air controls construction work needs before it starts. The hospital's infection preventionist and facilities team run it. The contractor builds the controls it calls for and keeps them in place until the area is signed off.

How the class is set

What each class asks of the contractor

The paperwork

How BuildControl tracks this

BuildControl keeps the ICRA permit on the job with its class worked out from the type of work and the risk group, on the original matrix or ICRA 2.0, and a daily ICRA log of each room under containment. When the surveyor asks who checked the barriers and when, the record is on the job.

This is general information, not legal or regulatory advice. HCAI's, the Joint Commission's and each hospital's requirements change and differ by facility. Confirm anything here against the current published guidance and your project's approved documents before relying on it.

Start with a 30-day trial, then Starter at $99 a month (up to 3 active jobs) or Pro at $249 a month (unlimited jobs). Your subs and owners don't need a paid seat.